Application Details

Contact Person: Planning Officer or Building Officer (as below)
Contact Email: council@charlessturt.sa.gov.au
Contact Telephone: (08) 8408 1111
Please note:
Decision Notifications may take up to five (5) business days to process after the date of the decision.
No site works or building work or changing the use of the land can commence on this development unless notification of Development Approval has been received.
The Minister's fees are calculated at 7% of the Building Rules Consent charges.


Application Details
Application Number252/0207/21
DescriptionDemolition of existing dwelling and associated structures
GroupDevelopment Act Applications
CategoryComplying Development
Sub CategoryBuilding Rules Only (Schedule 1A), Class 10a - Garages Verandahs etc, Class 1a - Dwellings, Demolition
Lodgement Date25/01/2021
Stage/DecisionApproved
Development Value/Estimated Cost$10,000.00


Additional Information
Date of Application21/01/2021
Date Received25/01/2021
Assessment timeframe2 week assessment timeframe
DA Decision Date25/01/2021
DPC Decision Date25/01/2021
Planning Decision ByCity of Charles Sturt
Planning Private Certifier 
Date Received by Private Certifier 
Planning OfficerElio Calo
Building Rules Lodgement Date25/01/2021
BRC Decision Date25/01/2021
Building Decision ByCity of Charles Sturt
Building OfficerElio Calo
Building Work Completion 
Building Work Commencement10/06/2021


Name Details
AssociationNameService Address
ApplicantDomenic Condina309 Montacute Road ATHELSTONE SA 5076


Properties
Address
Land DescriptionLot 13 DP 4551 Vol 5690 Fol 217


Related Applications
No information is available.

Events
PLANNING ASSESSMENTNot Applicable25/01/2021
BUILDING RULES PROCESSCouncil25/01/2021
DEVELOPMENT APPROVALApproved25/01/2021


Council Notes for Planning Private Certifiers
No information is available.

Conditions
Development in Accordance with Plans

~~~ Develop in accordance with the approved plans

 

 That the proposal shall be developed in accordance with the details and approved plans stamped by Council except where varied by the conditions herein and shall be completed prior to occupation of the proposed development and at all times thereafter needs to be maintained to Council’s satisfaction.

 

 Reason:  To ensure the development proceeds in an orderly manner.

 

 

Demolition work must be undertaken in accordance with the provisions of Australian Standard 2601 “The Demolition of Structures”

^^^ Demolition work must be undertaken in accordance with the provisions of Australian Standard 2601 “The Demolition of Structures”.

 

 

The owner/applicant/demolition contractor is to ensure that the requirements of other legislation or authorities are satisfied.

^^^ The owner/applicant/demolition contractor is to ensure that the requirements of other legislation or authorities are satisfied, eg Work Health and Safety Act and Regulations, Local Nuisance and Litter Control Act and Regulations, Environment Protection Act and Regulations, SafeWork SA, SA Water and the Department of Planning, Transport and Infrastructure.

 

 

Written notice of notifiable demolition work must be given to SafeWork SA

^^^ Written notice of notifiable demolition work must be given to SafeWork SA at least 5 days before the commencement of any work (including the use of scaffolding and asbestos removal).

 

 

Under the Environment Protection (Air Quality) Policy 2016, building materials or other debris associated with the demolition must not be burnt on the site.

^^^ Under the Environment Protection (Air Quality) Policy 2016, building materials or other debris associated with the demolition must not be burnt on the site.

 

 

A licenced pest control contractor should be engaged

^^^ A licenced pest control contractor should be engaged to carry out a vermin eradication program prior to the commencement of the demolition.

 

 

Footways adjacent to the site are to be kept in a safe condition at all times to protect pedestrians.

^^^ Footways adjacent to the site are to be kept in a safe condition at all times to protect pedestrians. On completion of the works the footways must be reinstated to the satisfaction of the City of Charles Sturt pursuant to the Local Government Act 1999. It is illegal to undertake work on Council land without permission.

 

 

To avoid nuisance or damage being caused to persons or property effective measures must be taken to prevent building materials rubbish and soil from falling or being blown from the building site onto other properties or roadways.

^^^ To avoid nuisance or damage being caused to persons or property, effective measures must be taken to prevent building materials, rubbish, and soil from falling or being blown from the building site onto other properties or roadways.  This includes drag out from trucks entering or leaving the building site.  Please ensure that your demolition discards are recycled by an accredited reclaimer.

 

 

This approval does not imply approval to alter infrastructure

^^^ The approval for this development DOES NOT imply approval to alter, shift or remove any existing public infrastructure, including street trees and/or landscaping or any other street furniture or features.  Approval to alter any of these must be obtained from Council or the relevant government department or service authority. All costs associated with such alteration are the sole responsibility of the applicant.

 

 



Building Rules Consent Charges
ChargeSchedule 1a - Building Rules Only Fee
Charge Amount$56.50

ChargeBuilding Class 10a Additional (non minimum)
Charge Amount$24.50

ChargeBuilding Class 1a Additional (non minimum)
Charge Amount$69.09


Attributes
DescriptionAttribute ClassAttribute Type
Bldg Class 10a Carport verandah shed or the like#ABS 10a
Bldg Class 1a single dwelling semi detached row#ABS 1a