Lake Las Vegas

M Con, Inc. has received many jobs from Lake Las Vegas, including 6A Sewer and Parker Point. 6A Sewer was a job given to M Con, Inc. The job started in June of 2017 and was completed. The job involved the installation of a water quality sewer main that ran across Lake Las Vegas Parkway. The workers ran into a few issues during the job. There was a 16” gas line that directly intersected the newly installed sewer main. To resolve the conflicting issue, M Con, Inc. had to coordinate with Southwest Gas to lower the existing line. There were also pre-existing power lines and an additional two water mains found at the end, one 16" and the other 20", that had to be raised as well. But in the end, the job proceeded without an issue.

 